An energy audit is a systematic procedure that reconstructs how an organisation uses energy, identifies where it is wasted, and quantifies possible measures, including costs, expected savings and payback periods.
For some businesses, it is a legal obligation that carries penalties. For all others, it remains the most reliable tool for deciding where to invest, provided it is based on measured data rather than estimates.
An energy audit is not simply a site inspection followed by a quotation. It is a regulated procedure defined by the UNI CEI EN 16247 series, divided into five parts: general requirements (Part 1), buildings (Part 2), processes (Part 3), transport (Part 4) and auditor competence (Part 5). The first four parts were updated in 2022.
The expected result is twofold. First, a reliable overview of consumption, broken down by different areas and uses, with energy performance indicators that allow comparisons over time. Second, a list of improvement measures, each with an estimated investment, expected savings and payback period.
Without the second part, it is not an energy audit but merely a consumption report. Without the first, the second cannot stand on its own.
There is no substantial difference: they mean the same thing. “Energy audit” is the term used in European directives and technical literature, while “diagnosi energetica” is the term adopted by Italian legislation. Official documents use them interchangeably.
The real differences concern two other documents that are often confused with an energy audit:
| Entity | Obligation | Notes |
|---|---|---|
| Large enterprises (over 250 employees, or turnover over €50 million, or balance sheet total over €43 million) | Audit every 4 years | Across all production sites, according to the sampling criteria in ENEA guidelines |
| Energy-intensive companies (listed in the CSEA registers) | Audit every 4 years | Regardless of company size |
| Companies with a certified management system (ISO 50001, EMAS, EN ISO 14001) | Exempt | Only if the system includes an energy audit compliant with Annex 2 of Legislative Decree 102/2014 |
| Large enterprises with very low energy consumption | Self-certification | ENEA requires registration on the portal with self-certification for consumption below the threshold specified in the operational guidance |
The obligation arises from Article 8 of Legislative Decree 102/2014: the first audit was due by 5 December 2015, with repetition every four years. Businesses that become subject to the obligation later follow their own individual deadline.
Audits must be submitted to ENEA through the audit102.enea.it portal, using the format and sector-specific spreadsheets required by the guidelines.
Note that the regulatory framework is evolving: with the transposition of the EED Directive 2023/1791, the criterion will change from company size to energy consumption.
Under the draft decree circulated in Italy, companies consuming between 10 and 85 TJ per year will have to carry out an audit, while those exceeding 85 TJ will need a certified management system under ISO 50001. As of the date of this article, the decree has not yet been published.
This is not a formal obligation without consequences. Article 16 of Legislative Decree 102/2014 provides for:
In both cases, paying the penalty does not remove the obligation: the audit must still be carried out.
A mandatory energy audit must be carried out by qualified professionals:
There is no formal restriction for voluntary audits, but using a certified professional remains the simplest way to obtain a document that can also be used for regulatory purposes.
The EN 16247 series dedicates a specific part to buildings, Part 16247-2, because auditing a building is not the same as auditing an industrial plant. Those managing offices, hotels, healthcare facilities or retail networks face four practical differences:
There is no official price list, and it is wise to be wary of anyone who quotes a price before knowing what needs to be measured. The cost depends on four variables:
This is where the most significant price difference lies: a company that already measures its consumption can substantially reduce the most expensive part of the audit. Historical data is already available, the measurement campaign is shorter, and the auditor can focus on analysis rather than data collection.
This is not merely a theoretical issue. In ENEA's assessments of mandatory audits submitted in November 2025, around 70% of non-compliances concerned the monitoring strategy: unspecified measurement points, campaigns that were too short, and missing or unrepresentative load profiles.
Issues with the technical and economic analysis also include lists of measures without an assessment of expected savings and, explicitly, measures copied from audits in different sectors.
There is another figure that matters even more. Audits submitted in 2025 indicate annual savings of around 29.7 ktoe already achieved, compared with a total potential of 68.2 ktoe: less than half of what the audits themselves had identified.
In our experience, the most common cause is always the same: the audit is a document, not a process. If nobody measures consumption afterwards, there is no way to know which measures worked, and the next audit starts again from estimates.
The three approaches fit together better than they might appear:
This is complemented by the evolving regulatory framework of the EPBD Directive, which points in the same direction: understanding the actual performance of buildings and documenting it.
The quality of an audit depends on the data available when the auditor arrives. With utility bills alone, much of the work is estimation; with a year of data for each utility, the work becomes analysis.
UTwin's energy management software addresses precisely this need: the provision of smart meters and IoT sensors for energy, water, gas and environmental parameters; cloud-based historical data storage; visualisation on the building model; automatic anomaly alerts; and remote system adjustments based on outdoor weather and occupancy.
The real value, however, comes after the audit. Once the measures have been implemented, energy consumption monitoring makes it possible to verify actual savings, correct what did not work and approach the next audit with real figures instead of another list of estimates.
The integrated maintenance software tracks completed work, providing the documentation required at each inspection.
An EPC certifies a building's energy performance calculated under standard operating conditions and is required for sales, rentals and building-related compliance. An energy audit analyses an organisation's actual consumption and identifies improvement measures with their costs, savings and payback periods. These are different documents with different purposes.
The obligation under Legislative Decree 102/2014 applies every four years, starting from the first deadline of 5 December 2015. Businesses that became subject to the obligation later follow their own individual deadline. With the transposition of the EED Directive, the criterion will shift from company-size parameters to annual energy consumption.
ESCo companies certified under UNI CEI 11352, Energy Management Experts (EGE) certified under UNI CEI 11339, and energy auditors meeting the requirements of UNI CEI EN 16247-5.
There is no fixed price list: the cost depends on the number of sites, energy sources, system complexity and scope of the measurement campaign. A company that already has an active monitoring system pays less because much of the data collection has already been completed.
No, provided that the management system includes an energy audit compliant with Annex 2 of Legislative Decree 102/2014. Article 8 of the decree provides this exemption for systems compliant with ISO 50001, EMAS and EN ISO 14001.
If the deadline is approaching, the question to ask is not whom to hire for the audit, but how well the company measures its energy use today. A year of data for each utility changes the outcome: the audit becomes a defensible action plan instead of a document to file away, and savings verification becomes automatic.